sugarplums_121309_HD720_iPhone.mp4 (14mb)
My final critique went about as I expected as far the panel's critique. They pointed out all the things that bother me (color of the last shot, titles, etc.), and we agreed that if I choose to do any more finishing I should address these issues. Patricia in particular urged me to continue to polish the integration of composited elements.
I was very proud to pass with honors. It was a personal goal of mine from the day I signed my acceptance to do my best at CADA, and it was gratifying to hear the panel's opinion that I had done so.
So, on now to the next thing...
2009-12-21
2009-12-10
2009-11-29
2009-11-17
2009-11-09
2009-11-03
2009-10-27
Gifts footage...Finally!
Finally got the "gift" elements in the studio. Here is a rough comp with the bike, and some grabs from the footage.
shot_10_t02_03_iPhone.mp4 (606 KB)





shot_10_t02_03_iPhone.mp4 (606 KB)





2009-10-23
2009-10-20
Midterm Status
I have the shoot day happening this weekend.
- Need to consult the list of everything I need and make sure all is ready.
- Also need to consider another set of hands.
- The color correction and masks are mostly finished.
- The magic effect is started, but not finished.
- Need to begin creating particle effects.
- The magic background is not yet satisfactory
- Need to test the "ballerina" footage
- Need to create opening titles
- Need credits
- Need to plan final "under tree" shot
- Need to finish modeling houses/lamposts
- All models need texturing
- Sound design is proceeding
2009-10-08
Studio status
The shoot booked over the weekend of the 17th/18th is tentative. Hopefully it will go away and I can use the studio that weekend.
- Need to get firm availability of Wren, Phelan, Skazenski.
- Also need to make sure I have all the props I'll need. Skates I have, bike from Puffy but need to make sure it's ok, trains from pops/uncle neil. Need to figure out that gateman. Maybe a trip to Nick Smith over the weekend.
- Remember to get some invisible thread and create a "tunnel" stencil to cut out hole in green foamcore.
- Review the visual script/survey info from day 1.
- Arrange transportation.
2009-10-07
Week 6 Goals
- get shoot together
- styleframes for dream sequence
- styleframes for magic effect
- opening shot
- 3d bedroom
- mattes for footage
- update schedule
- update blog
2009-10-04
Mixing 60fps and 24fps
After testing, the best results are interpreting 60fps footage native, placement in a 24fps comp, and time stretch to desired speed. Iffy results with frame blending, probably better without. Could try a plugin for better timestretch algorithm...
2009-09-27
Studio Testing
In the studio testing mostly for shot 21. Good news is that this shot can be accomplished with the aid of the green cloth, and will not require a fully painted studio. A production day will no longer be delayed for this reason. That's the good news...
The challenge I've yet to solve is how to assist and confirm optical lineup in production. I can't shoot until I have a proven method. Possibilities include:
Though shot 21 can be done on the floor, I will also need to shoot some table top shots, which will require a surface large enough to accommodate the length of track needed. Acquiring all materials for production should now be a top priority, as should scheduling a production weekend.
I'll also remind myself here that the "gifts" will be shot at 60 fps for clarity, and I ought to test this variable footage rate in my workflow using the footage I shot last semester. I also need to revisit my notes regarding shutter angle, fstop, etc. Remember that it will take a lot of light...
The challenge I've yet to solve is how to assist and confirm optical lineup in production. I can't shoot until I have a proven method. Possibilities include:
- Getting gfx7 functioning with a multibridge for use in the studio. Seems like it currently doesn't have an operating system...
- Using gfx3 as a means of importing camera footage for test composite. Either of these methods present the problem of getting the camera feed into a box, which I've not successfully accomplished. Seems to be a sync problem? Check w/ Quinto...
- Getting a studio switcher with A/B inputs to mix two images
Though shot 21 can be done on the floor, I will also need to shoot some table top shots, which will require a surface large enough to accommodate the length of track needed. Acquiring all materials for production should now be a top priority, as should scheduling a production weekend.
I'll also remind myself here that the "gifts" will be shot at 60 fps for clarity, and I ought to test this variable footage rate in my workflow using the footage I shot last semester. I also need to revisit my notes regarding shutter angle, fstop, etc. Remember that it will take a lot of light...
2009-09-24
Thesis Week 4 Goals
- scan review forms, email .pdf
- test shoot frame 21
- test shoot "analog" elements
- styleframes for magic sequence
- gather props
- create room in Maya
- img. planes/modeling tiny houses
- final trimmed media w/ handles in new folder
2009-09-22
2009-09-18
Thesis Week 2 Goals
- prep story reel w/ composite elements
- outline for panel review
- gather remaining props
- img. planes, modeling colonial
- model tunnel, textures for tunnel
- test floor plane, model room interior
2009-09-15
Subscribe to:
Posts (Atom)


